20 answers for: Builder of roads, bridges etc (5,8) |
RANK | ANSWER | CLUE |
| CIVILENGINEER | Builder of roads, bridges etc (5,8) |
| CIVILENGINEERING | The design of roads, bridges, etc |
| ENGINEER | Which title is given to a designer of roads, bridges etc? (8) |
| ENGINEERS | They design roads, bridges etc. (9) |
| RIVERCROSSING | Ford, ferry, bridge etc (5,8) |
| THOMASTELFORD | Colossus of Roads foretold maths problem (6,7) |
| ROYALENGINEERS | Branch of the British Army that undertakes the building of fortifications, mines, bridges, etc |
| TELFORD | Nicknamed the Colossus of Roads by Robert Southey, a builder of canals, churches, roads, aqueducts and a number of bridges including one spanning the Menai Strait (7) |
| PIER | Support of arch, bridge etc (4) |
| TRUSS | A structural framework of wood or metal, used to support a roof, bridge, etc (5) |
| GAMES | Bingo, bridge, etc. |
| TOLL | Fee paid to cross a bridge, etc (4) |
| WADE | Commander of the troops sent into Scotland against the Jacobites who oversaw the construction of some 250 miles of roads and 40 bridges across the Highlands (4) |
| KEYS | The 'Overseas Highway' is a 127.5 mile stretch of roads and bridges traversing the islands of the Fl |
| JUNCTION | Meeting (of roads, etc) |
| NETWORK | System of roads, etc |
| LOG | (of roads) Made of logs laid down crosswise. |
| NAVVY | Labourer employed in the building of roads, canals, etc. (5) |
| INCAS | Builders of 25,000+ miles of roads in South America |
| CATTLEGRIDS | Sets of metal bars in the surface of roads (6-5) |
|